Lewis Center Framing Project

The cabinet installation company acted recklessly by removing a load-bearing wall without proper support. Simply installing a new header with joist hangers is inadequate, as they're designed for ceiling weight, not second-story floors. The proper procedure includes first installing a temporary support system with steel beams or columns before safely removing the wall. To replace a load-bearing wall, a new one must be constructed using sturdy materials, anchored to the foundation and house framing, and reinforced for structural integrity.

Previous
Previous

Newark Granville Rd Flooring Fix

Next
Next

Longford Laundry Room Wainscoting